Key Points for Valve Installation

Key Points for Valve Installation

Sep. 29, 2026

Avoid These 5 Pitfalls in Valve Installation to Prevent 90% of Common Troubles

●Reversed flow direction: results in valve failure, internal leakage and seal damage.

●Misaligned flanges and disordered bolt tightening: causes biased pressure and leakage.

●Valve not fully open during welding: thermal deformation of sealing surfaces.

●Forced alignment: valve bears permanent stress, leading to cracking and leakage later.

●Installation without pressure testing and cleaning: foreign particles jam and damage sealing surfaces.

 

Pre-installation: Three Critical Checks to Eliminate Root Hazards

 

1.Verification of Documentation and Parameters

Verify that model, nominal diameter, pressure class, material and medium compatibility are 100% consistent with drawings.

Check certificates, pressure test reports and material certificates. Special service conditions (explosion-proof, high-temperature, corrosive) require specific certifications.

For safety valves, confirm intact lead seals; seals must not be removed without authorization.

 

2.Pre-inspection of Appearance and Performance

Valve body free of cracks, blowholes, deformation and corrosion; sealing surfaces scratch-free; flanges/threads undamaged.

Manually open and close the valve through full travel 2–3 times. No jamming or looseness; full open/close positions achieved.

For main pipeline valves and high-pressure valves, perform body strength test (1.5 times nominal pressure) plus seat leakage test. Installation permitted only after pressure holding without leakage.

 

3.Cleaning and Protection

Remove welding slag, rust and debris from valve cavity and pipe ends to prevent scratches on sealing surfaces.

Keep protective end caps on valves until installation. Store temporarily in dry and ventilated areas; place valve stem upward, do not stack, avoid outdoor rain exposure.

 

 

II. During Installation: Four Core Principles to Prevent Rework and Leakage

1.Flow Direction Must Not Be Reversed

Install in accordance with the arrow marked on valve body, matching the medium flow direction. Reverse installation is strictly prohibited.

Globe valves: medium enters from lower side and exits upper side. Reverse mounting leads to poor shut-off and excessive operating torque.

Check valves, steam traps and throttle valves: strictly follow flow direction and required mounting orientation (horizontal / vertical).

 

2.Location and Operating Clearance

Prioritize locations for easy operation, maintenance and inspection. Handwheel height is recommended at 1.2 m.

For valves on horizontal pipelines, handwheel shall not face downward. Install platforms or chain wheel operators for overhead valves.

Stagger adjacent valves, reserve ≥30 cm clearance for maintenance.

 

3.Connection Methods: Details Determine Sealing Integrity

◇Flange Connection (Most Common)

Install valve in closed position. Keep flange faces parallel and well centered; forced alignment is forbidden.

Place gasket centrally without offset. Tighten bolts diagonally in multiple passes with uniform torque.

High-temperature pipelines: cold pre-tightening plus secondary hot tightening to prevent high-temperature seizure.

◇Welded Connection

Carry out welding with valve fully open to protect sealing surfaces from deformation.

Use GTAW root pass, control welding temperature to avoid thermal stress damage to valve body.

◇Threaded Connection

Apply thread sealant / PTFE tape. Screw in by hand for 2–3 turns before final tightening; over-tightening is prohibited.

Leave 2–3 threads exposed. Clean excess sealant promptly to prevent entry into valve cavity.

 

4.Stress-free Installation Is a Bottom-line Requirement

Align pipes naturally; the valve shall not bear extra tension, torsion or weight from piping.

Install dedicated supports for large-bore and heavy-duty valves to avoid flange deformation and leakage.

 

III. Post-installation: Commissioning & Acceptance for Closed-loop Safety Control

Visual inspection: firm connections, correct orientation and clear markings.

Open/close test: smooth operation, correct position indication and no jamming.

Tightness test: conduct pressure test per specifications; no leakage at seats, packing and flanges.

Documentation filing: complete and traceable records of pressure test, commissioning and acceptance.

Ready To Work With Us?

If you have any enquiries, please feel free to reach out to us.

Contact Us

Contact Us

Phone : +86-510-8356 8681

Telephone : +86-139 2127 3425

E-mail : sales@xmzkf.com

Wechat : +86-139 2127 3425

WhatsApp : +86 139 2127 3425

Adress : No.6, Zhenyang Road, Yangshi, Luoshe Town, Wuxi, Jiangsu, China.

Copyright © Wuxi Xinming Auto-Control Valves Industry Co., Ltd.d All Rights Reserved | Sitemap | Privacy Policy